Final | 5/12/2003 | 5/12/2003 | 5/12/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/12/2003 at 8:00:24 AM. Contact: ###-####.
|
Rough-in | 2/14/2003 | 2/18/2003 | 2/18/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/14/2003 at 3:30:26 PM. Contact: ###-####. c/n itims completed 2/18/2003 11:14:03 AM
|
Pressure Test | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/14/2003 at 7:28:38 AM. Contact: ###-####.
|
Rough-in | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | FAIL |
Alan Hauser
|
|
|
one 60 degree offset at flue allowed, need secondary drain at 2nd floor furnace a/c coil 2/14/2003 11:41:56 PM
|