Final | 4/24/2003 | 4/25/2003 | 4/25/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 4/24/2003 at 2:18:44 PM. Contact: ###-####.
|
Final | 4/23/2003 | 4/24/2003 | 4/24/2003 | P | FAIL |
Alan Hauser
|
|
|
support over span horizontal flue connector at furn. 4/24/2003 11:43:10 PM
|
Pressure Test | 2/24/2003 | 2/25/2003 | 2/25/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/24/2003 at 4:48:18 PM. Contact: ###-####.
|
Rough-in | 2/24/2003 | 2/25/2003 | 2/25/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/24/2003 at 4:47:54 PM. Contact: ###-####.
|