Final | 6/24/2003 | 6/25/2003 | 6/25/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/24/2003 at 5:27:54 PM. Contact: ###-####.
|
Final | 6/4/2003 | 6/4/2003 | 6/4/2003 | P | FAIL |
Dixie Fellows
|
|
|
Please call Don ###-#### or Troy ###-#### if access code is needed or for precise directions. Thank you.; Phone #: ###-#### Internet Inspection Request from: Lena Sloan called troy..need specs for mantle clearance 6/4/2003 4:37:46 PM
|
Final | 6/3/2003 | 6/3/2003 | 6/3/2003 | P | FAIL |
Dixie Fellows
|
|
|
Please call Don ###-#### if access code is needed.; Phone #: ###-#### Internet Inspection Request from: Lena Sloan no address posted..which building?? 6/3/2003 1:55:49 PM
|
MEC-Aging Inspection | 5/12/2003 | 5/12/2003 | 5/12/2003 | | PASS |
Dixie Fellows
|
|
|
work in progress 5/12/2003 8:31:09 AM
|
Rough-in | 3/6/2003 | 3/7/2003 | 3/7/2003 | A | PASS |
Tom Arcoraci
|
|
|
INTERMOUNTAIN FIREPLACE LIC # CON03-00241; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|