Final | 4/7/2003 | 4/8/2003 | 4/8/2003 | P | PASS |
Alan Hauser
|
|
|
PLEASE CALL BEN BEFORE INSPECTION SO THAT HE CAN MEET YOU THERE. ; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
Rough-in | 3/31/2003 | 4/1/2003 | 4/1/2003 | P | PART |
Alan Hauser
|
|
|
duct ok for plaza 2, 3rd flr. north side 4/2/2003 12:50:19 AM
|
Conference | 3/14/2003 | 3/14/2003 | 3/14/2003 | P | PASS |
Alan Hauser
|
|
|
meeting at 2 pm
|
Rough-in | 3/12/2003 | 3/12/2003 | 3/12/2003 | P | PART |
Alan Hauser
|
|
|
meet ben at front entry by broadway at 3 pm 3/12/2003 6:40:08 PM
|
Rough-in | 3/7/2003 | 3/10/2003 | 3/10/2003 | P | PART |
Alan Hauser
|
|
|
PLEASE CALL BEN AT ###-#### BEFORE GOING.; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister meet with ben, looked at duct, waiting for meeting between rick jackson and tony with washington group to see what they want looked at 3/13/2003 2:02:09 AM
|
Rough-in | 3/3/2003 | 3/4/2003 | 3/4/2003 | P | FAIL |
Alan Hauser
|
|
|
Phone #: ###-#### couldn't find work, and no answer to my two calls to this contact number. recall when some one is able to meet at this address for inspection 3/5/2003 1:10:39 AM
|