Final | 7/15/2003 | 7/16/2003 | 7/16/2003 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/15/2003 at 12:31:12 PM. Contact: ###-####. out of time in am 7/16/2003 10:48:25 AM
|
Final | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | PASS |
Tony Young
|
|
|
|
Rough-in | 3/7/2003 | 3/10/2003 | 3/10/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/7/2003 at 1:45:06 PM. Contact: ###-####.
|
Rough-in | 3/4/2003 | 3/7/2003 | 3/7/2003 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/4/2003 at 1:21:36 PM. Contact: ###-####.
|
Rough-in | 3/4/2003 | 3/5/2003 | 3/4/2003 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/4/2003 at 9:33:42 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 4 2003 1:21PM.
|
Rough-in | 3/3/2003 | 3/4/2003 | 3/4/2003 | A | NR |
Tom Arcoraci
|
|
|
###-#### not installed 3/4/2003 10:13:11 AM
|