Final | 6/9/2003 | 6/10/2003 | 6/10/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 3:49:51 PM. Contact: ###-####.
|
Rough-in | 4/15/2003 | 4/15/2003 | 4/15/2003 | P | PART |
Alan Hauser
|
|
|
need to change upper combustion air duct, this can be checked at final, ok for cover when structural is ready, code section is 2000 irc g2407.15#6 4/15/2003 11:45:56 PM
|
Pressure Test | 4/11/2003 | 4/14/2003 | 4/14/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/11/2003 at 11:04:26 AM. Contact: ###-####. done by 350 4/14/2003 10:21:57 AM
|
Rough-in | 4/14/2003 | 4/14/2003 | 4/14/2003 | P | FAIL |
Tony Young
|
|
|
re-inspection fee imposed,,,, 1st c/n not complete 4/14/2003 3:21:12 PM
|
Rough-in | 4/11/2003 | 4/14/2003 | 4/14/2003 | A | NH |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/11/2003 at 11:04:04 AM. Contact: ###-####.
|
Pressure Test | 4/8/2003 | 4/9/2003 | 4/9/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 4/8/2003 at 10:51:55 AM. Contact: ###-####.
|
Rough-in | 4/8/2003 | 4/9/2003 | 4/9/2003 | P | FAIL |
Alan Hauser
|
|
|
c/n at back door, need combustion air and flue liner joints lapped backwards 4/10/2003 1:22:31 AM
|