Final | 6/23/2003 | 6/23/2003 | 6/23/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/23/2003 at 7:42:36 AM. Contact: ###-####.
|
Pressure Test | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | PASS |
Alan Hauser
|
|
|
denton; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Rough-in | 5/9/2003 | 5/12/2003 | 5/12/2003 | A | PASS |
Alan Hauser
|
|
|
duct ok, no pressure test 5/12/2003 8:11:08 PM
|
Rough-in | 3/11/2003 | 3/11/2003 | 3/11/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/11/2003 at 7:52:43 AM. Contact: ###-####.
|
Rough-in | 3/10/2003 | 3/10/2003 | 3/10/2003 | P | FAIL |
Alan Hauser
|
|
|
need combustion air for gas equipment, minimum of 61 sq inches 3/10/2003 10:46:09 PM
|