Final | 5/2/2003 | 5/5/2003 | 5/5/2003 | A | PASS |
Dixie Fellows
|
|
|
done by 407 5/5/2003 7:11:11 AM
|
Final | 5/2/2003 | 5/2/2003 | 5/2/2003 | A | PASS |
Russ Owen
|
|
|
|
Final | 5/2/2003 | 5/2/2003 | 5/2/2003 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/2/2003 at 8:27:36 AM. Contact: ###-####.
|
Final | 4/29/2003 | 5/1/2003 | 5/1/2003 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/29/2003 at 2:47:35 PM. Contact: ###-####. nobody had been there yet per home owner 5/1/2003 8:47:29 AM
|
Final | 5/1/2003 | 5/1/2003 | 5/1/2003 | P | CANC |
Russ Owen
|
|
|
###-#### tara unable to do out of time. 5/2/2003 7:31:17 AM
|
Final | 3/21/2003 | 3/21/2003 | 3/21/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/21/2003 at 9:45:11 AM. Contact: ###-####. F/P R/I only....OK. 3/21/2003 2:31:16 PM
|
Final | 3/20/2003 | 3/20/2003 | 3/20/2003 | P | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/20/2003 at 11:16:17 AM. Contact: ###-####...OFF EMERALD BETWEEN COLE AND CURTIS...ROCKY..###-#### 3/20/2003 12:16:16 PM LEFT MESSAGE ON MACHINE 3/20/2003 1:17:29 PM
|
Final | 3/12/2003 | 3/13/2003 | 3/13/2003 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/12/2003 at 11:06:13 AM. Contact: ###-####. talked to shawna 3/13/2003 10:12:49 AM
|
Pressure Test | 3/12/2003 | 3/13/2003 | 3/13/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/12/2003 at 11:05:52 AM. Contact: ###-####.no work done. 3/13/2003 10:10:40 AM
|
Pressure Test | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | NR |
Dixie Fellows
|
|
|
A-1 FIREPLACE CO; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Rough-in | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | NR |
Dixie Fellows
|
|
|
A-1 FIREPLACE CO; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|