Final | 7/9/2003 | 7/10/2003 | 7/10/2003 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 7/9/2003 at 2:23:52 PM. Contact: ###-####.
|
Pressure Test | 5/30/2003 | 5/30/2003 | 5/30/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/30/2003 at 7:20:02 AM. Contact: ###-####. 20lb test on 1" line from side of garage to pool htr/bbq...ok 5/30/2003 11:02:15 AM
|
Pressure Test | 4/1/2003 | 4/1/2003 | 4/1/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 7:43:52 AM. Contact: ###-####.
|
Rough-in | 4/1/2003 | 4/1/2003 | 4/1/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 7:43:36 AM. Contact: ###-####.
|