Final | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/14/2003 at 9:16:30 AM. Contact: ###-####.
|
Pressure Test | 4/14/2003 | 4/15/2003 | 4/15/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/14/2003 at 4:29:02 PM. Contact: ###-####. 60 lb test ok 4/15/2003 11:23:04 AM
|
Pressure Test | 3/31/2003 | 4/1/2003 | 4/1/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/31/2003 at 4:55:33 PM. Contact: ###-####.
|
Rough-in | 3/31/2003 | 4/1/2003 | 4/1/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/31/2003 at 4:54:59 PM. Contact: ###-####.
|
Pressure Test | 3/21/2003 | 3/21/2003 | 3/21/2003 | P | FAIL |
Dixie Fellows
|
|
|
###-#### jeff
|
Rough-in | 3/21/2003 | 3/21/2003 | 3/21/2003 | P | FAIL |
Dixie Fellows
|
|
|
###-#### jeff ceiling covered with sheetrock..no ladder to access accic 3/21/2003 4:08:26 PM
|
Pressure Test | 3/18/2003 | 3/19/2003 | 3/19/2003 | A | FAIL |
Dixie Fellows
|
|
|
doors locked..left notice 3/19/2003 9:39:14 AM
|
Rough-in | 3/18/2003 | 3/19/2003 | 3/19/2003 | A | FAIL |
Dixie Fellows
|
|
|
###-#### doors locked..left notice 3/19/2003 9:38:58 AM
|