Rough-in | 4/7/2003 | 4/7/2003 | 4/7/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 9:33:42 AM. Contact: ###-####.
|
Rough-in | 3/27/2003 | 3/27/2003 | 3/27/2003 | P | FAIL |
Alan Hauser
|
|
|
manuf. requires 3" clearance above all horizontal venting to combustibles 3/27/2003 11:06:21 PM
|