Final | 6/24/2003 | 6/25/2003 | 6/25/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/24/2003 at 3:50:31 PM. Contact: ###-####. called raoul 6/25/2003 10:17:56 AM
|
Final | 6/25/2003 | 6/25/2003 | 6/25/2003 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Final | 6/24/2003 | 6/24/2003 | 6/24/2003 | P | FAIL |
Dixie Fellows
|
|
|
###-#### corrections not done..talked to raoul 6/24/2003 6:48:09 PM
|
Pressure Test | 6/2/2003 | 6/3/2003 | 6/3/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/2/2003 at 1:13:13 PM. Contact: ###-####.
|
Pressure Test | 5/23/2003 | 5/23/2003 | 5/23/2003 | P | PASS |
Dixie Fellows
|
|
|
###-#### mary 20# TEST TO KIT EQUIPMENT OK 5/23/2003 5:52:34 PM
|
Pressure Test | 4/3/2003 | 4/4/2003 | 4/4/2003 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 10:23:39 AM. Contact: ###-####. 60lb test to all rtu and mau ok. will need test on low pressure to kit equip of 1 1/4 main which is med press 4/4/2003 9:20:57 AM
|