Final | 5/1/2003 | 5/1/2003 | 5/1/2003 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/1/2003 at 8:27:49 AM. Contact: ###-####.
|
Final | 5/1/2003 | 5/1/2003 | 5/1/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/1/2003 at 8:27:49 AM. Contact: ###-####.
|
Pressure Test | 4/2/2003 | 4/2/2003 | 4/2/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/2/2003 at 10:41:18 AM. Contact: ###-####.
|
Pressure Test | 4/1/2003 | 4/1/2003 | 4/1/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 9:25:30 AM. Contact: ###-####. gas failed..$44.10 reinspection fee 4/1/2003 3:40:56 PM
|
Pressure Test | 3/31/2003 | 3/31/2003 | 3/31/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/31/2003 at 10:15:40 AM. Contact: ###-####. leak..called cont 3/31/2003 2:51:21 PM
|
Pressure Test | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/28/2003 at 10:55:57 AM. Contact: ###-####. wrong guage...wrong test 3/28/2003 3:11:32 PM
|