Final | 4/17/2003 | 4/18/2003 | 4/18/2003 | A | PASS |
Dixie Fellows
|
|
|
KIRK; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Final | 4/16/2003 | 4/17/2003 | 4/17/2003 | A | FAIL |
Dixie Fellows
|
|
|
KIRK; Phone #: ###-#### Internet Inspection Request from: Darla Downs need specs on vent insulate//insulate metal in crawl..comb air 4/17/2003 11:42:23 AM
|
Final | 4/14/2003 | 4/16/2003 | 4/16/2003 | P | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/14/2003 at 12:38:23 PM. Contact: ###-####. called cont 4/16/2003 4:46:47 PM
|
Final | 4/10/2003 | 4/11/2003 | 4/11/2003 | P | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/10/2003 at 3:21:37 PM. Contact: ###-####...off northview before cole 4/11/2003 11:57:02 AM...n/h...busy signal 4/11/2003 12:24:19 PM left notice 4/11/2003 1:53:28 PM
|