Final | 7/31/2003 | 7/31/2003 | 7/31/2003 | P | PASS |
Tony Young
|
|
|
###-####h jody ###-#### w
|
Rough-in | 5/6/2003 | 5/7/2003 | 5/7/2003 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/6/2003 at 1:14:40 PM. Contact: ###-####.
pressure test ok also 5/7/2003 10:28:37 AM
|
Rough-in | 5/1/2003 | 5/2/2003 | 5/2/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/1/2003 at 11:10:34 AM. Contact: ###-####.c/n on site 5/2/2003 11:02:12 AM
|