Final | 8/10/2004 | 8/11/2004 | 8/11/2004 | A | NH |
Lane Manuel
|
|
|
bob- ###-#### call 1st before insp
|
Pressure Test | 10/16/2003 | 10/16/2003 | 10/16/2003 | P | NH |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/16/2003 at 7:55:21 AM. Contact: ###-####.
|
Rough-in | 10/16/2003 | 10/16/2003 | 10/16/2003 | P | NH |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/16/2003 at 7:54:44 AM. Contact: ###-####.
|
Pressure Test | 9/4/2003 | 9/4/2003 | 9/4/2003 | P | PASS |
Dixie Fellows
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Annette Moore all 3 tests ok 9/4/2003 2:10:02 PM
|
Rough-in | 9/4/2003 | 9/4/2003 | 9/4/2003 | P | PART |
Dixie Fellows
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Annette Moore left corrections on both end units..middle unit not done yet 9/4/2003 2:10:26 PM
|
Pressure Test | 6/9/2003 | 6/10/2003 | 6/10/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 4:43:37 PM. Contact: ###-####. all doors locked called ken 6/10/2003 2:59:11 PM
|
Rough-in | 6/9/2003 | 6/10/2003 | 6/10/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 4:43:03 PM. Contact: ###-####. all doors locked called ken 6/10/2003 2:59:01 PM
|