Final | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/31/2003 at 2:08:40 PM. Contact: ###-####.
|
Rough-in | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/31/2003 at 2:08:16 PM. Contact: ###-####.
|
Final | 7/23/2003 | 7/23/2003 | 7/23/2003 | P | FAIL |
Dixie Fellows
|
|
|
Please call Val Hill ###-#### if access code is needed.; Phone #: ###-#### Internet Inspection Request from: Lena Sloan need key-valve outside of f/p 7/23/2003 4:22:57 PM
|
Rough-in | 5/2/2003 | 5/5/2003 | 5/5/2003 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Lena Sloan no address posted 5/5/2003 12:06:49 PM
|