Final | 6/3/2003 | 6/3/2003 | 6/3/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/3/2003 at 8:28:05 AM. Contact: ###-####.
|
Final | 5/30/2003 | 6/2/2003 | 6/2/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/30/2003 at 3:19:37 PM. Contact: ###-####. all doors locked 6/2/2003 12:38:00 PM
|
Pressure Test | 4/30/2003 | 4/30/2003 | 4/30/2003 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evans
|
Rough-in | 4/30/2003 | 4/30/2003 | 4/30/2003 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Evans
|