Final | 11/21/2003 | 11/24/2003 | 11/24/2003 | P | PASS |
Dixie Fellows
|
|
|
of 11/24/2003 11:59:49 AM....off curtis to robertson before overland 11/24/2003 12:00:09 PM
|
Pressure Test | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 8:42:43 AM. Contact: ###-####.
|
Rough-in | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 8:42:15 AM. Contact: ###-####.
|