Final | 7/7/2003 | 7/8/2003 | 7/8/2003 | P | PASS |
Dave Hannah
|
|
|
###-#### chris
|
Final | 6/26/2003 | 6/27/2003 | 6/27/2003 | P | NH |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/26/2003 at 7:17:16 AM. Contact: ###-####.
|
Final | 6/25/2003 | 6/25/2003 | 6/25/2003 | P | NR |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/25/2003 at 8:08:23 AM. Contact: ###-####.
|
Rough-in | 4/29/2003 | 4/30/2003 | 4/30/2003 | A | PASS |
Dave Hannah
|
|
|
###-####
|
Pressure Test | 4/28/2003 | 4/28/2003 | 4/28/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 4/28/2003 at 9:25:19 AM. Contact: ###-####.
|
Rough-in | 4/28/2003 | 4/28/2003 | 4/28/2003 | P | FAIL |
Alan Hauser
|
|
|
c/n at front window with new code sections 4/28/2003 11:43:09 PM
|