Final | 5/22/2003 | 5/22/2003 | 5/22/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/22/2003 at 10:45:50 AM. Contact: ###-####.
|
Rough-in | 4/23/2003 | 4/23/2003 | 4/23/2003 | P | PASS |
Alan Hauser
|
|
|
all joints at metal sealed and screwed up 4/23/2003 11:14:03 PM
|
Pressure Test | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | PASS |
Alan Hauser
|
|
|
Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
Rough-in | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | NR |
Alan Hauser
|
|
|
all metal to metal connections need to be tight, screwed and sealed with mastic 4/22/2003 11:29:43 PM
|