Final | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/31/2003 at 4:00:50 PM. Contact: ###-####.
|
Final | 7/29/2003 | 7/30/2003 | 7/30/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/29/2003 at 10:14:26 AM. Contact: ###-####.
|
Rough-in | 4/30/2003 | 5/1/2003 | 5/1/2003 | A | PASS |
Jim Sly
|
|
|
###-#### P/T OK. 5/1/2003 10:46:15 AM
|
Rough-in | 4/29/2003 | 4/29/2003 | 4/29/2003 | P | FAIL |
Dixie Fellows
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore NO ADDRESS POSTED 4/29/2003 2:30:23 PM
|