Final | 7/15/2003 | 7/16/2003 | 7/16/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/15/2003 at 1:17:17 PM. Contact: ###-####.
|
Final | 7/16/2003 | 7/16/2003 | 7/16/2003 | A | CANC |
Alan Hauser
|
|
|
|
Final | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | FAIL |
Alan Hauser
|
|
|
finish hvac at grid ceiling areas before cover 6/18/2003 7:50:52 PM
|
Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 | A | PART |
Alan Hauser
|
|
|
duct ok, no grid or smoke detectors installed, recall before tile 5/22/2003 8:21:44 PM
|
Rough-in | 5/6/2003 | 5/7/2003 | 5/7/2003 | A | PART |
Alan Hauser
|
|
|
roof curbs anchored as per manuf. 5/7/2003 7:55:11 PM
|
Rough-in | 5/5/2003 | 5/6/2003 | 5/6/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/5/2003 at 11:37:56 AM. Contact: ###-#### 5/6/2003 9:35:00 AM..larry 5/6/2003 9:36:31 AM cont called for curb insp..plans say per manuf..no manuf specs on site..i called cont and told him 5/6/2003 10:21:18 AM
|