DOC - Permit Finaled | | | 3/18/2004 | | DONE |
|
|
|
|
Final | 3/11/2004 | 3/11/2004 | 3/11/2004 | P | PASS |
Troy James
|
|
|
|
Final | 3/2/2004 | 3/3/2004 | 3/3/2004 | A | PART |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rhonda Marcum
|
Final | 3/2/2004 | 3/3/2004 | 3/3/2004 | P | PART |
Troy James
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Pressure Test | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | PASS |
Dixie Fellows
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 100lb test on hydronics ok...all pipe tested 2/12/2004 10:35:18 AM
|
Pressure Test | 2/11/2004 | 2/11/2004 | 2/11/2004 | P | FAIL |
Dixie Fellows
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Darla Downs guage pegged 2/11/2004 1:51:21 PM
|
Rough-in | 2/10/2004 | 2/10/2004 | 2/10/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/10/2004 at 7:49:45 AM. Contact: ###-####. 100LB HYDRONIC FOR HEAT OK 2/10/2004 2:55:15 PM
|
Pressure Test | 2/9/2004 | 2/9/2004 | 2/9/2004 | P | PASS |
Dixie Fellows
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Annette Moore 60LB GAS TEST IN MECH ROOM OK //411
|
Rough-in | 12/9/2003 | 12/10/2003 | 12/10/2003 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/9/2003 at 1:13:47 PM. Contact: ###-####...ok to cover all lids up to mech room 12/10/2003 9:45:17 AM
|
Rough-in | 12/9/2003 | 12/10/2003 | 12/10/2003 | A | PART |
Dixie Fellows
|
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 100lb hydronic test and 60lb main gas to mech room ok 12/10/2003 9:45:48 AM
|
Rough-in | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | FAIL |
Dixie Fellows
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Rough-in | 10/21/2003 | 10/24/2003 | 10/24/2003 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/21/2003 at 8:31:51 AM. Contact: ###-####. walk-through with brad and looked at layout..no s.f dampers, etc installed yet 10/24/2003 9:47:28 AM
|
Conference | 9/18/2003 | 9/19/2003 | 9/19/2003 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rhonda Marcum
|
MEC-Aging Inspection | 9/1/2003 | 9/1/2003 | 9/1/2003 | | PASS |
Dixie Fellows
|
|
|
work in progress 9/2/2003 8:01:36 AM
|
Pressure Test | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PART |
Alan Hauser
|
|
|
tested only piping on old roof, where pipe goes from 10# and splits into two 5# lines, one for old bldg. and one will extend over into new bldg. 7/1/2003 11:41:57 PM
|
Conference | 6/19/2003 | 6/20/2003 | 6/20/2003 | A | PASS |
Dixie Fellows
|
|
|
don ###-####
|
Conference | 6/19/2003 | 6/19/2003 | 6/19/2003 | P | NR |
Dixie Fellows
|
|
|
###-#### don will meet don fri am..reschedled 6/19/2003 3:53:52 PM
|