Final | 8/26/2003 | 8/26/2003 | 8/26/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 8/26/2003 at 10:37:44 AM. Contact: ###-####.
|
Rough-in | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/15/2003 at 4:58:04 PM. Contact: ###-####.
|
Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 | A | FAIL |
Alan Hauser
|
|
|
finish framing at both fire places 5/14/2003 9:37:38 PM
|