Final | 9/16/2003 | 9/16/2003 | 9/16/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/16/2003 at 8:51:44 AM. Contact: ###-####.
|
Final | 9/12/2003 | 9/15/2003 | 9/15/2003 | P | FAIL |
Alan Hauser
|
|
|
cabinets on side of gas range to low 9/15/2003 1:55:45 PM
|
Pressure Test | 6/5/2003 | 6/6/2003 | 6/6/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/5/2003 at 3:13:35 PM. Contact: ###-####.
|
Pressure Test | 6/3/2003 | 6/3/2003 | 6/3/2003 | P | FAIL |
Alan Hauser
|
|
|
pressure test failed 2nd time, reinspection fee 6/4/2003 12:44:11 AM
|
Pressure Test | 5/27/2003 | 5/27/2003 | 5/27/2003 | P | FAIL |
Dave Hannah
|
|
|
brent everything except range vent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Rough-in | 5/27/2003 | 5/27/2003 | 5/27/2003 | P | PASS |
Dave Hannah
|
|
|
brent everything except range vent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|