Final | 7/17/2003 | 7/17/2003 | 7/17/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 9:27:43 AM. Contact: ###-####.193 7/17/2003 9:38:16 PM
|
Rough-in | 5/28/2003 | 5/29/2003 | 5/29/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/28/2003 at 11:44:33 AM. Contact: ###-####. P/T ok. 5/29/2003 12:45:37 PM
|
Pressure Test | 5/27/2003 | 5/27/2003 | 5/27/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/27/2003 at 9:28:39 AM. Contact: ###-####.
|
Rough-in | 5/27/2003 | 5/27/2003 | 5/27/2003 | P | FAIL |
Alan Hauser
|
|
|
mastic required 2000IRC m1601.3.1 5/28/2003 12:38:55 AM
|