Final | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/13/2003 at 9:01:13 AM. Contact: ###-####.
|
Rough-in | 6/4/2003 | 6/5/2003 | 6/5/2003 | A | PASS |
Dixie Fellows
|
|
|
###-#### ken
|
Conference | 6/4/2003 | 6/4/2003 | 6/4/2003 | P | PASS |
Dixie Fellows
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Rough-in | 6/3/2003 | 6/3/2003 | 6/3/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/3/2003 at 7:45:33 AM. Contact: ###-####. CORRECTIONS NOT DONE...REINSP FEE 6/3/2003 4:56:37 PM
|
Pressure Test | 5/30/2003 | 6/2/2003 | 6/2/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/30/2003 at 1:28:56 PM. Contact: ###-####.
|
Rough-in | 5/30/2003 | 6/2/2003 | 6/2/2003 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/30/2003 at 1:28:25 PM. Contact: ###-####. C/N...Mastic and insul 6/2/2003 11:44:07 AM
|