Final | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | PASS |
Alan Hauser
|
|
|
troy- ###-####- call 1st before insp
|
Final | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | DONE |
Alan Hauser
|
|
|
|
Final | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | CANC |
Jim Storey
|
|
|
troy- ###-####- call 1st before insp out of time. 8/21/2003 4:43:50 PM
|
Rough-in | 6/23/2003 | 6/24/2003 | 6/24/2003 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 6/23/2003 at 2:09:41 PM. Contact: ###-####.
|
Rough-in | 6/6/2003 | 6/9/2003 | 6/9/2003 | A | FAIL |
Alan Hauser
|
|
|
termination cap to close to roof overhang 6/9/2003 9:27:59 PM
|