Final | 8/12/2003 | 8/12/2003 | 8/12/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 7:53:57 AM. Contact: ###-####. no card on site 8/12/2003 3:51:08 PM
|
Pressure Test | 6/25/2003 | 6/26/2003 | 6/26/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/25/2003 at 4:47:53 PM. Contact: ###-####.
|
Rough-in | 6/25/2003 | 6/26/2003 | 6/26/2003 | A | PART |
Alan Hauser
|
|
|
duct smoke detectors required at each r.a. and outside air for ventilation to come from outside 6/26/2003 7:01:49 PM
|
Rough-in | 6/20/2003 | 6/23/2003 | 6/23/2003 | A | FAIL |
Dixie Fellows
|
|
|
###-#### GAS PIPE UNDERSIZED..NO PINK BATTING OVER METAL IN ATTIC..NEED 1 1/2" FOIL BACK INSULATION AT Y'S...SOME INSULATION FALLING OFF METAL DUCTWORK 6/23/2003 2:16:45 PM
|
Rough-in | 6/19/2003 | 6/20/2003 | 6/20/2003 | A | NR |
Dixie Fellows
|
|
|
There is a key by the left side of the back door under a piece of wood.; Phone #: ###-#### Internet Inspection Request from: misty evans rescheduled 6/20/2003 8:48:16 PM
|
Pressure Test | 6/2/2003 | 6/2/2003 | 6/2/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/2/2003 at 11:01:42 AM. Contact: ###-####.
|
Rough-in | 6/2/2003 | 6/2/2003 | 6/2/2003 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/2/2003 at 11:01:27 AM. Contact: ###-####. NO PLANS ON SITE..NEED LADDER FOR ACCESS TO EQUIPMENT 6/2/2003 3:55:41 PM
|