Rough-in | 6/6/2003 | 6/9/2003 | 6/9/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/6/2003 at 2:34:30 PM. Contact: ###-####.
|
Rough-in | 6/4/2003 | 6/4/2003 | 6/4/2003 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/4/2003 at 8:52:02 AM. Contact: ###-####. no listing to verrify instalion requriments. 6/4/2003 4:00:04 PM
|