Final | 9/10/2003 | 9/10/2003 | 9/10/2003 | P | PASS |
Dixie Fellows
|
|
|
GREG; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
Conference | 9/9/2003 | 9/9/2003 | 9/9/2003 | P | NR |
Steven Webb
|
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Darla Downs Wrong phone number--no one at site, left c/notice. 9/9/2003 1:24:47 PM
|
Final | 7/25/2003 | 7/28/2003 | 7/28/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 12:30:02 PM. Contact: ###-####. not even close to being ready for a final 7/28/2003 12:12:55 PM
|
Pressure Test | 6/11/2003 | 6/12/2003 | 6/12/2003 | A | PASS |
Dixie Fellows
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Rough-in | 6/11/2003 | 6/12/2003 | 6/12/2003 | A | PASS |
Dixie Fellows
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Pressure Test | 6/10/2003 | 6/11/2003 | 6/11/2003 | A | FAIL |
Dixie Fellows
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 | A | FAIL |
Dixie Fellows
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|