Final | 8/26/2004 | 8/26/2004 | 8/26/2004 | P | PASS |
Troy James
|
|
|
chad; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Pressure Test | 8/24/2004 | 8/25/2004 | 8/25/2004 | A | PART |
Alan Hauser
|
|
|
front steps and walk, snow melt system ok 8/25/2004 11:52:42 AM
|
Mec-Request for Extension | 8/11/2004 | 8/11/2004 | 8/11/2004 | | DONE |
Troy James
|
|
|
###-####
ok to extend permit 8/11/2004 1:03:07 PM
|
Rough-in | 12/8/2003 | 12/9/2003 | 12/9/2003 | P | PASS |
Alan Hauser
|
|
|
Dale; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Pressure Test | 9/4/2003 | 9/5/2003 | 9/5/2003 | A | PART |
Alan Hauser
|
|
|
pressure test ok for lower south section of hydronic piping 9/5/2003 11:04:49 AM
|
Final | 6/30/2003 | 7/1/2003 | 7/1/2003 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/30/2003 at 2:16:48 PM. Contact: ###-####.
|
Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PART |
Dave Hannah
|
|
|
gas piping for fire place
|
Rough-in | 6/27/2003 | 6/27/2003 | 6/27/2003 | P | NR |
Alan Hauser
|
|
|
del late afternoon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Pressure Test | 6/25/2003 | 6/25/2003 | 6/25/2003 | P | PART |
Alan Hauser
|
|
|
gas pipe and combustion air duct ok for cover on 2nd level 6/25/2003 10:39:08 PM
|
Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 | A | PART |
Alan Hauser
|
|
|
gasline at fire place ok to cover, only thing looked at 6/11/2003 7:55:36 PM
|
Pressure Test | 6/9/2003 | 6/10/2003 | 6/10/2003 | P | CANC |
Alan Hauser
|
|
|
###-#### Ultimate heating gas log in basement only late afternoon please
|
Rough-in | 6/9/2003 | 6/10/2003 | 6/10/2003 | P | CANC |
Alan Hauser
|
|
|
will do in am 6/11/2003 12:48:52 AM
|