Final | 8/5/2003 | 8/6/2003 | 8/6/2003 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 2:45:06 PM. Contact: ###-####.
|
Pressure Test | 6/23/2003 | 6/24/2003 | 6/24/2003 | P | PASS |
Dixie Fellows
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Rough-in | 6/23/2003 | 6/24/2003 | 6/24/2003 | P | PASS |
Dixie Fellows
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|