Final | 12/4/2003 | 12/5/2003 | 12/5/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/4/2003 at 11:41:13 AM. Contact: ###-####.
|
Rough-in | 11/17/2003 | 11/18/2003 | 11/18/2003 | P | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 4:16:37 PM. Contact: ###-####.
|
Rough-in | 10/10/2003 | 10/13/2003 | 10/13/2003 | P | PART |
Alan Hauser
|
|
|
room on southside and area along the east wall ceilings ok 10/13/2003 4:12:06 PM
|
Rough-in | 10/6/2003 | 10/7/2003 | 10/7/2003 | A | PART |
Alan Hauser
|
|
|
s.w. corner above ceiling ok 10/7/2003 2:24:16 PM
|
Rough-in | 9/26/2003 | 9/26/2003 | 9/26/2003 | P | PART |
Alan Hauser
|
|
|
area over stage/platform 9/26/2003 3:00:07 PM
|
Rough-in | 9/5/2003 | 9/8/2003 | 9/8/2003 | A | PART |
Alan Hauser
|
|
|
n.e. class rooms ok for cover 9/8/2003 9:52:46 AM
|