Conference | 9/5/2003 | 9/8/2003 | 9/8/2003 | P | PASS |
Alan Hauser
|
|
|
|
Final | 9/8/2003 | 9/8/2003 | 9/8/2003 | P | PASS |
Jim Storey
|
|
|
|
Final | 9/4/2003 | 9/4/2003 | 9/4/2003 | A | FAIL |
Alan Hauser
|
|
|
ok per alan to put inspection for this am...dld crawlspace ventilation not as per boise city approved method 9/4/2003 11:42:29 AM
|
Final | 9/2/2003 | 9/3/2003 | 9/3/2003 | P | PASS |
Alan Hauser
|
|
|
crawl space ventilation designed and installed by hvac contractor. no test report available 9/3/2003 1:04:52 PM
|
Final | 8/27/2003 | 8/28/2003 | 8/28/2003 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 8/27/2003 at 3:11:13 PM. Contact: ###-####.
|
Final | 8/25/2003 | 8/26/2003 | 8/26/2003 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 8/25/2003 at 12:57:29 PM. Contact: ###-####.
|
Pressure Test | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PASS |
Steven Webb
|
|
|
OFFICE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PASS |
Steven Webb
|
|
|
OFFICE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Pressure Test | 6/27/2003 | 6/30/2003 | 6/30/2003 | A | FAIL |
Dave Hannah
|
|
|
###-#### design air
|
Rough-in | 6/27/2003 | 6/30/2003 | 6/30/2003 | A | FAIL |
Dave Hannah
|
|
|
###-#### design air c/n on site 6/30/2003 10:43:18 AM
|