Final | 10/1/2003 | 10/1/2003 | 10/1/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 8:52:26 AM. Contact: ###-####. call 1\2 hr prior to going. 10/1/2003 1:12:06 PM .off south cole 10/1/2003 1:12:14 PM
|
Rough-in | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 11:54:50 AM. Contact: ###-####. rest of concentric kits ok 8/22/2003 9:48:44 AM
|
Rough-in | 8/4/2003 | 8/5/2003 | 8/5/2003 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 2:34:48 PM. Contact: ###-####. ok to cover sec 5-12 8/5/2003 4:14:07 PM
|