Final | 9/9/2003 | 9/10/2003 | 9/10/2003 | A | PASS |
Jim Sly
|
|
|
###-#### kole
|
Final | 9/8/2003 | 9/8/2003 | 9/8/2003 | P | NR |
Jim Sly
|
|
|
###-#### kole
|
Final | 9/4/2003 | 9/4/2003 | 9/4/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/4/2003 at 6:24:49 AM. no address posted 9/4/2003 9:43:29 AM
|
Final | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 9:30:18 PM. Contact: ###-####. NO ADDRESS POSTED 8/29/2003 11:45:16 AM
|
Pressure Test | 7/10/2003 | 7/10/2003 | 7/10/2003 | P | PASS |
Jim Sly
|
|
|
SHANE -FOR F/P ALSO--###-####
|
Rough-in | 7/10/2003 | 7/10/2003 | 7/10/2003 | P | PASS |
Jim Sly
|
|
|
CELL ###-####- SHANE
|