Final | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | PASS |
Tony Young
|
|
|
|
Final | 10/22/2003 | 10/22/2003 | 10/22/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/22/2003 at 11:12:15 AM. Contact: ###-####. Need a ladder at the access to the 2nd floor unit. posted this on c/n at furnace in garage. 10/21/2003 10:05:19 PM
|
Pressure Test | 7/22/2003 | 7/23/2003 | 7/23/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/22/2003 at 5:09:27 PM. Contact: ###-####.
|
Rough-in | 7/22/2003 | 7/23/2003 | 7/23/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/22/2003 at 5:09:12 PM. Contact: ###-####.
|