Final | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 3:32:55 PM. Contact: ###-####. OK perm Occ. 7/29/2003 10:09:38 AM
|
Rough-in | 7/18/2003 | 7/18/2003 | 7/18/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/18/2003 at 9:24:09 AM. Contact: ###-####. ducts only still needs to install grillls and flex units installed with shell and core 7/18/2003 3:59:58 PM
|
Rough-in | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | FAIL |
Alan Hauser
|
|
|
locked 7/17/2003 2:12:38 AM
|