Final | 10/17/2003 | 10/17/2003 | 10/17/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/17/2003 at 7:02:21 AM. Contact: ###-####.
|
Final | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/18/2003 at 11:57:25 AM. Contact: ###-####. not ready 8/19/2003 10:16:12 AM
|
Final | 8/15/2003 | 8/18/2003 | 8/18/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/15/2003 at 3:01:56 PM. Contact: ###-####....door locked...left notice
8/18/2003 11:36:33 AM
|
Rough-in | 7/25/2003 | 7/28/2003 | 7/28/2003 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 1:12:03 PM. Contact: ###-####. wrong permit..called cont 7/28/2003 10:00:59 AM
|
Rough-in | 7/23/2003 | 7/24/2003 | 7/24/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/23/2003 at 7:44:51 AM. Contact: ###-####.allready passed by 316 on 7/21/03. 7/24/2003 9:13:30 AM
|
Pressure Test | 7/18/2003 | 7/21/2003 | 7/21/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/18/2003 at 3:47:01 PM. Contact: ###-####.
|
Rough-in | 7/18/2003 | 7/21/2003 | 7/21/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/18/2003 at 3:46:35 PM. Contact: ###-####.
|