DOC - Permit Finaled | | | 3/3/2004 | | DONE |
|
|
|
|
Final | 8/15/2003 | 8/18/2003 | 8/18/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/15/2003 at 3:02:58 PM. Contact: ###-####.
|
Final | 8/14/2003 | 8/15/2003 | 8/15/2003 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 8:58:20 AM. Contact: ###-####.
|
Rough-in | 7/25/2003 | 7/28/2003 | 7/25/2003 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 1:09:06 PM. Contact: ###-####.cancel per lindsey with trust heating
|
Rough-in | 7/24/2003 | 7/25/2003 | 7/25/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/24/2003 at 8:36:29 AM. Contact: ###-####. P/T ok 7/25/2003 11:36:37 AM
|