Final | 10/6/2003 | 10/7/2003 | 10/7/2003 | A | PASS |
Dixie Fellows
|
|
|
RE-INSPECT FINAL; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
Final | 10/1/2003 | 10/2/2003 | 10/2/2003 | A | FAIL |
Dixie Fellows
|
|
|
|
Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | FAIL |
Dave Hannah
|
|
|
PLEASE RE-INSPECT; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen all c/n items not completed 7/31/2003 10:07:21 AM
|
Rough-in | 7/31/2003 | 7/31/2003 | 7/31/2003 | P | PASS |
Dixie Fellows
|
|
|
###-#### ###-####..corrections done..will call russ to put up green sticker..dixie 7/31/2003 1:35:37 PM
|
Rough-in | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 4:53:55 PM. Contact: ###-####.//seal s locks
|
Pressure Test | 7/26/2003 | 7/28/2003 | 7/28/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/26/2003 at 12:50:55 PM. Contact: ###-####.
|
Rough-in | 7/26/2003 | 7/28/2003 | 7/28/2003 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/26/2003 at 12:50:41 PM. Contact: ###-####. C/N use approved tape at metal/metal connections, insul can attic, Hook up exhaust ducts. 7/28/2003 2:39:27 PM
|