Final | 2/27/2004 | 3/1/2004 | 3/1/2004 | A | PASS |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Pressure Test | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 10:39:09 AM. Contact: ###-####.
|
Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 10:38:57 AM. Contact: ###-####.
|