Final | 10/6/2003 | 10/6/2003 | 10/6/2003 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/6/2003 at 9:37:02 AM. Contact: ###-####.
|
Final | 9/17/2003 | 9/17/2003 | 9/17/2003 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/17/2003 at 10:57:09 AM. Contact: ###-####. work not ready flue not connected ac lines not etc. 9/16/2003 10:53:52 PM
|
Rough-in | 7/24/2003 | 7/25/2003 | 7/25/2003 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 7/23/2003 | 7/24/2003 | 7/24/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/23/2003 at 1:37:24 PM. Contact: ###-####.
|