Final | 11/4/2003 | 11/4/2003 | 11/4/2003 | P | PASS |
Alan Hauser
|
|
|
|
Final | 10/27/2003 | 10/28/2003 | 10/28/2003 | A | NR |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/27/2003 at 11:33:00 AM. Contact: ###-####.
|
Rough-in | 10/13/2003 | 10/13/2003 | 10/13/2003 | P | PART |
Alan Hauser
|
|
|
walked job with job foreman from construction company, wasn't sure what was to be looked at, looked like all area completed. waiting for air balance report to be submitted to contractor, a copy of report was requested for city of boise. 10/13/2003 4:52:07 PM
|
Rough-in | 9/30/2003 | 9/30/2003 | 9/30/2003 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/30/2003 at 10:13:51 AM. Contact: ###-####.
|
Rough-in | 9/17/2003 | 9/18/2003 | 9/18/2003 | A | PART |
Alan Hauser
|
|
|
remove fire caulking around smoke fire damper, and some areas duct only no grid 9/18/2003 12:05:07 PM
|