Final | 11/17/2003 | 11/18/2003 | 11/18/2003 | A | PASS |
Dixie Fellows
|
|
|
###-#### --- call Rod with IC3 for access information. ###-####
|
Final | 9/12/2003 | 9/12/2003 | 9/12/2003 | P | NR |
Alan Hauser
|
|
|
still in r/i stage, called contractor, not sure on pressure to bldg. to be 2 or 5 pound. 9/12/2003 2:36:52 PM
|
Pressure Test | 8/19/2003 | 8/19/2003 | 8/19/2003 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/19/2003 at 8:01:10 AM. Contact: ###-####. 60lb test ok..single line 8/19/2003 3:29:23 PM
|
Pressure Test | 8/6/2003 | 8/7/2003 | 8/7/2003 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 1:02:06 PM. Contact: ###-####.
|
Pressure Test | 8/5/2003 | 8/6/2003 | 8/6/2003 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 2:37:58 PM. Contact: ###-####. pouring concrete..no access to meter 8/6/2003 10:39:51 AM
|
Pressure Test | 8/5/2003 | 8/5/2003 | 8/5/2003 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 8:51:56 AM. Contact: ###-####.
|