Final | 1/31/2004 | 2/2/2004 | 2/2/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/31/2004 at 10:26:10 AM. Contact: ###-####.
|
Final | 1/12/2004 | 1/12/2004 | 1/12/2004 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 8:23:18 AM. Contact: ###-####. not ready for final..gas to f/p ok 1/12/2004 2:58:59 PM
|
Pressure Test | 12/1/2003 | 12/2/2003 | 12/2/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/1/2003 at 7:39:00 AM. Contact: ###-####...off franklin on auto 12/2/2003 8:15:59 AM 60lb test to all equipment ok 12/2/2003 9:38:40 AM
|
MEC-Aging Inspection | 11/4/2003 | 11/4/2003 | 11/4/2003 | | PASS |
Dixie Fellows
|
|
|
work in progress 11/4/2003 12:36:37 PM
|