Final | 9/3/2003 | 9/4/2003 | 9/4/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/3/2003 at 4:34:05 PM. Contact: ###-####.
|
Final | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 5:03:47 PM. Contact: ###-####. waiting on sensors 8/29/2003 9:01:47 AM
|
Final | 8/27/2003 | 8/28/2003 | 8/28/2003 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/27/2003 at 1:51:22 PM. Contact: ###-####. left correction..signed temp occ 8/28/2003 2:55:22 PM
|
Rough-in | 8/22/2003 | 8/26/2003 | 8/26/2003 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 8/22/2003 at 1:31:01 PM. Contact: ###-####.
|
Conference | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | PASS |
Dixie Fellows
|
|
|
his fees are paid but is there owner supplied equipment???? met with alan 8/21/2003 12:09:35 PM
|
Conference | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | PART |
Alan Hauser
|
|
|
his fees are paid but is there owner supplied equipment????
|