Final | 3/10/2004 | 3/10/2004 | 3/10/2004 | P | PASS |
Alan Hauser
|
|
|
combustion air openings into water heater enclosure didn't meet 2000 IRC G2407.10, so builder removed door and hinges at enclosure 3/10/2004 2:16:22 PM
|
Final | 3/8/2004 | 3/9/2004 | 3/9/2004 | A | FAIL |
Troy James
|
|
|
Please call Jeff Stone prior to inspection @ ###-####. Thank You; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
Still need to comply with previous corrections. Need 65 square inch opening each. 3/9/2004 10:05:52 AM
|
Final | 3/9/2004 | 3/9/2004 | 3/9/2004 | P | FAIL |
Alan Hauser
|
|
|
no inspections till fee paid, third trip, corrections not completed 3/9/2004 3:27:11 PM
|
Final | 3/5/2004 | 3/5/2004 | 3/5/2004 | P | FAIL |
Alan Hauser
|
|
|
water heater needs combustion air as required by formula in 2000 IRC g2407.10 3/5/2004 2:48:35 PM
|
Final | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/11/2004 at 3:29:34 PM. Contact: ###-####.
need to finsh job 1st 2/13/2004 3:17:46 PM
|
Pressure Test | 9/12/2003 | 9/12/2003 | 9/12/2003 | P | DONE |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 9:42:58 AM. Contact: ###-####.
|
Rough-in | 9/12/2003 | 9/12/2003 | 9/12/2003 | P | DONE |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 9:42:36 AM. Contact: ###-####.
|
Pressure Test | 9/3/2003 | 9/5/2003 | 9/5/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/3/2003 at 9:23:11 AM. Contact: ###-####.
|
Rough-in | 9/3/2003 | 9/5/2003 | 9/5/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/3/2003 at 9:22:50 AM. Contact: ###-####.
|